Skip to content

Exterior · Rory

Driveways and paths that stay flat

Block paving built on a properly dug-out, compacted base, with concrete-haunched edges and planned drainage, so it doesn't dip where the car parks.

Placeholder image: a block-paved driveway

What's included

  • Dug out to the right depth for cars, typically 200–250 mm for a driveway
  • Geotextile membrane over soft ground
  • MOT Type 1 sub-base, compacted in layers
  • Edge kerbs set on concrete haunching so the blocks can't spread
  • Blocks laid on a screeded grit sand bed, then cut and compacted
  • Kiln-dried sand brushed into the joints
  • Drainage planned in: permeable blocks, channel drains or a soakaway
  • Advice on dropped kerbs, which the council has to approve
Placeholder image: hard landscaping detail

The process

How it goes

  1. Quote visit. Rory measures up, checks falls and where water will go, and talks through block styles.
  2. Dig out. Excavated to depth, with spoil taken away by grab lorry.
  3. Edges. Kerbs set on concrete haunching.
  4. Base. MOT Type 1 laid and compacted.
  5. Lay. Sand bed screeded, blocks laid, cut and compacted.
  6. Finish. Joints sanded, the area cleaned and handed over.

Typical timescales

Typical two-car block-paved driveway
4–6 days
Garden path with edging
2–3 days
Before driving on it, while the edge haunching sets
3 days

Materials

Materials we use

  • Block paving such as Marshalls Driveline or Brett blocks, in a range of colours and finishes.
  • Permeable block paving such as Marshalls Priora, which lets rain soak through.
  • MOT Type 1 sub-base and geotextile membrane over soft ground.
  • Grit sand for the bedding layer and kiln-dried sand for the joints.
  • Concrete haunching behind every edge kerb.
  • ACO channel drains where water needs collecting across the drive.

Questions people ask

  • Do I need planning permission for a new driveway?

    Not if the surface is permeable, or if the water runs onto a lawn or border on your own property. If you cover more than 5 m² of front garden with a surface that drains onto the road, you do. We design to avoid that.

  • Can you do the dropped kerb?

    A new dropped kerb has to be approved by Staffordshire County Council, and the work on the footway is done by an approved contractor. We'll point you in the right direction and build the drive to meet it.

  • How do I stop weeds coming through?

    Well-compacted joints and a top-up of kiln-dried sand now and then. Most weeds seed into the joints from above rather than growing up through the base. A sealer can help if they're a problem.

  • Do you lay tarmac or resin?

    We concentrate on block paving, flags and paths. [EDIT: confirm whether Rory offers resin or tarmac]

  • How long does block paving last?

    On a proper base, decades. And if a drain ever needs work underneath, blocks can be lifted and relaid without a patch showing.

Driveway seen better days?

Book a free visit. Rory will check the levels and drainage and send you a written quote.

Book a free quote visit