Skip to content

Exterior · Rory

Concrete bases sized for the load

Hot tubs, garden rooms, workshops and garages all need different depths and reinforcement. Rory works out what yours needs, then forms, pours and finishes it properly.

Placeholder image: a concrete base

What's included

  • Setting out and levels
  • Excavation to depth, with the spoil taken away
  • Compacted MOT Type 1 sub-base
  • 1200-gauge polythene damp-proof membrane
  • Steel mesh reinforcement on spacers where the load needs it
  • Ready-mixed concrete delivered, barrowed or pumped if there's no lorry access
  • Tamped or float finish, with expansion joints on larger slabs
  • Left to cure properly before anything heavy goes on
Placeholder image: hard landscaping detail

The process

How it goes

  1. Quote visit. Rory checks what's going on the base, the ground, and how a concrete lorry can get in.
  2. Set out and dig. Marked out, excavated and the formwork set to level.
  3. Sub-base and membrane. MOT Type 1 compacted, membrane laid.
  4. Reinforce. Steel mesh on spacers, if it's needed.
  5. Pour. Concrete placed, compacted and finished.
  6. Cure. Kept covered and left to harden before it's loaded.

Typical timescales

Typical hot tub or garden room base
1–2 days
Single garage base
2–3 days
Curing before a filled hot tub goes on
7 days

Materials

Materials we use

  • Ready-mixed C25 or C30 concrete, depending on the use.
  • A142 or A193 steel mesh on spacers, so it sits in the slab rather than at the bottom.
  • 1200-gauge polythene damp-proof membrane.
  • MOT Type 1 crushed stone sub-base.
  • Expansion joint filler board on larger slabs.
  • Timber formwork, set to line and level.

Questions people ask

  • How thick does the base need to be?

    Typically about 100 mm for sheds and lighter garden rooms, and 150 mm or more, reinforced, for hot tubs and garages. Soft ground can need more. We'll tell you what yours needs and why.

  • What if a concrete lorry can't get to the back garden?

    We barrow it through or hire a concrete pump. If a pump is needed, it's shown on the quote as its own line.

  • Do garden rooms need building regulations approval?

    Many small garden rooms don't, but it depends on size, use and how close they are to the house and boundaries. Check with the garden room supplier, and we'll build the base to their spec.

  • Can you pour concrete in winter?

    Yes, but not when there's a frost forecast. We watch the weather and move the pour if we need to.

  • Does a hot tub need an electrician?

    Yes. A hot tub needs its own supply, installed and certified by a qualified electrician. We can leave a duct in the base for the cable.

Need a solid base for something heavy?

Book a free visit. Rory will check the ground and access and send you an itemised quote.

Book a free quote visit