Skip to content

Exterior · Rory · Stafford

Shed bases in Stafford

Concrete, slab or plastic grid bases, built level and slightly larger than the shed so the floor stays dry and doors keep closing. Rory covers Stafford and the villages around it, and quote visits are free.

Staffordshire's county town, on the River Sow, with Victorian terraces near the centre and post-war and newer estates further out.

What's included

  • Clearing and digging out the area
  • Compacted MOT Type 1 sub-base
  • Your choice of a concrete slab, paving slabs, or a gravel-filled grid base
  • A damp-proof membrane under concrete bases
  • Built level, with the top just above the surrounding ground so water runs away
  • Sized slightly larger than the shed footprint
  • A path or stepping stones to the door if you want one
Placeholder image: hard landscaping detail

The process

How it goes

  1. Quote visit. Rory checks the spot, the ground and access, and confirms the shed's size.
  2. Dig out. Turf and soil removed to depth.
  3. Sub-base. MOT Type 1 laid and compacted.
  4. Base. Concrete poured and finished, or slabs bedded, or grid laid and filled.
  5. Cure. Concrete is left to harden before the shed goes on.

Typical timescales

Slab or grid base for an 8 × 6 ft shed
1 day
Concrete base for a larger shed or summerhouse
1–2 days
Concrete curing time before the shed goes up
2–3 days

Materials

Materials we use

  • MOT Type 1 crushed stone sub-base.
  • C25 concrete, ready-mixed or mixed on site.
  • Polythene damp-proof membrane under concrete slabs.
  • Steel mesh in larger or heavier bases.
  • 600 × 600 mm paving slabs on a mortar bed for slab bases.
  • Recycled plastic grid bases, filled with gravel, where you want a free-draining option.

Shed bases in Stafford?

Book a free quote visit with Rory. You'll only see his real free times.

Book a free quote visit