Decking in Little Haywood

Timber and composite decks on a properly braced, treated frame, built level and with the right gaps for drainage. Rory covers Little Haywood and the villages around it, and quote visits are free.

Village next to Great Haywood, on the edge of Cannock Chase just off the A51.

What's included

  • Ground cleared, then weed membrane and gravel underneath
  • Footings: concrete pads or ground screws, depending on the ground
  • Frame in treated C16 or C24 joists at the spacing the boards need
  • Noggins and bracing so the deck doesn't bounce
  • Softwood, hardwood or composite boards
  • Coated or stainless screws, and hidden fixings for composite
  • Fascia boards to finish the edges
  • Steps, balustrades and handrails
Placeholder image: hard landscaping detail

The process

How it goes

  1. Quote visit. Rory measures up, checks the levels and talks through boards and finishes.
  2. Clear. Ground cleared and levelled, membrane and gravel laid.
  3. Footings. Pads or ground screws set out and fixed.
  4. Frame. Joists levelled, fixed and braced.
  5. Boards. Laid with even gaps, cut and finished with fascias.
  6. Extras. Steps, balustrades and handrails, then a final check.

Typical timescales

Typical 3 × 4 m ground-level deck
2–3 days
Raised deck with steps and balustrade
4–5 days
Height above which most decks need planning permission
30 cm

Materials

Materials we use

  • Pressure-treated C16 or C24 joists, treated for ground contact (UC4) where they're close to the soil.
  • Jacksons Jakcured timber for a longer-life frame.
  • Treated softwood deck boards, grooved or smooth.
  • Composite boards from makers such as Millboard and Trex for low upkeep.
  • Concrete pad footings or ground screws.
  • Coated or stainless deck screws, and joist tape on composite builds.