Exterior · Rory · Cotes Heath
Decking in Cotes Heath
Timber and composite decks on a properly braced, treated frame, built level and with the right gaps for drainage. Rory covers Cotes Heath and the villages around it, and quote visits are free.
Small village on the A519 north of Eccleshall.
What's included
- Ground cleared, then weed membrane and gravel underneath
- Footings: concrete pads or ground screws, depending on the ground
- Frame in treated C16 or C24 joists at the spacing the boards need
- Noggins and bracing so the deck doesn't bounce
- Softwood, hardwood or composite boards
- Coated or stainless screws, and hidden fixings for composite
- Fascia boards to finish the edges
- Steps, balustrades and handrails

The process
How it goes
- Quote visit. Rory measures up, checks the levels and talks through boards and finishes.
- Clear. Ground cleared and levelled, membrane and gravel laid.
- Footings. Pads or ground screws set out and fixed.
- Frame. Joists levelled, fixed and braced.
- Boards. Laid with even gaps, cut and finished with fascias.
- Extras. Steps, balustrades and handrails, then a final check.
Typical timescales
- Typical 3 × 4 m ground-level deck
- 2–3 days
- Raised deck with steps and balustrade
- 4–5 days
- Height above which most decks need planning permission
- 30 cm
Materials
Materials we use
- Pressure-treated C16 or C24 joists, treated for ground contact (UC4) where they're close to the soil.
- Jacksons Jakcured timber for a longer-life frame.
- Treated softwood deck boards, grooved or smooth.
- Composite boards from makers such as Millboard and Trex for low upkeep.
- Concrete pad footings or ground screws.
- Coated or stainless deck screws, and joist tape on composite builds.
Decking in Cotes Heath?
Book a free quote visit with Rory. You'll only see his real free times.
Book a free quote visit